The No1 end second mans side cabside, this area got a lick of primer but we wasn't happy with how the metal buckled under the footstep so its been cut out ready to be replaced
The No1 end second mans side cabside, this area got a lick of primer but we wasn't happy with how the metal buckled under the footstep so its been cut out ready to be replaced
New steel sections has arrived from our supplier, can you tell what some of them are for?
New steel sections has arrived from our supplier, can you tell what some of them are for?
The No2 end straight air brake was treated to a new metal surround, sadly the original one was very pitted with corrosion.
The No2 end straight air brake was treated to a new metal surround, sadly the original one was very pitted with corrosion.
Work has started on cutting the corroded metal out of the No1 end around the gangway door area,
Work has started on cutting the corroded metal out of the No1 end around the gangway door area,
As you can see the area under the horn grill has seen better days, this whole area will be replaced.
As you can see the area under the horn grill has seen better days, this whole area will be replaced.
Another view of the top of the gangway doors with the top edge cut away ready to be replaced
Another view of the top of the gangway doors with the top edge cut away ready to be replaced
A rather bright No2 end cab desk now sporting some undercoat green, this will later be finished in BR green and then have or the instruments refitted.
A rather bright No2 end cab desk now sporting some undercoat green, this will later be finished in BR green and then have or the instruments refitted.
Some of the instrument panels for the No2 end all cleaned up and primed ready for painting.
Some of the instrument panels for the No2 end all cleaned up and primed ready for painting.
With the desk apart for painting, all the electrical systems are being checked over and tested
With the desk apart for painting, all the electrical systems are being checked over and tested
Part of the cab roof now sports a rather tasty coat of cream paint, its certainly coming together now
Part of the cab roof now sports a rather tasty coat of cream paint, its certainly coming together now

 
 
 

Related Posts

See All

Comments


C37LG logo.png

The Class 37 Locomotive Group

Erinna Lodge, Mattishall Road

Dereham, Norfolk, NR20 3BU

  • C37LG Facebook
  • C37LG Instagram
  • C37LG X (Twitter)
  • C37LG eBay

© 1997-2025 The Class 37 Locomotive Group (C37LG).

The C37LG is a registered charity, registered in England. | Charity number: 1137787 | VAT registration number: GB 720 172 183

bottom of page