July Update

  • 3 hours ago
  • 2 min read
The west side of the loco now coming on at a very steady pace with new sections of steel being ground off
The west side of the loco now coming on at a very steady pace with new sections of steel being ground off
The new aluminium floor plates being trail fitted, these have had to have a fair bit trimmed off them to get them to fit
The new aluminium floor plates being trail fitted, these have had to have a fair bit trimmed off them to get them to fit
Part of the finished back wall looking rather tidy in cream, it defiantly brightens it up
Part of the finished back wall looking rather tidy in cream, it defiantly brightens it up
The stripped down No2 end, secondmans side cab door taken back to bear metal
The stripped down No2 end, secondmans side cab door taken back to bear metal

The bulk head doors all rubbed down and ready for painting
The bulk head doors all rubbed down and ready for painting
The first removed grill resting on the work bench, we are guessing that's original 1960's green on show
The first removed grill resting on the work bench, we are guessing that's original 1960's green on show
With the frame all rubbed down a coat of primer was applied ready for the top coat of cream.
With the frame all rubbed down a coat of primer was applied ready for the top coat of cream.
As we start fitting the cab back out, all the electrical systems are being checked. In this picture you can see the headcode box lit up and looking very nice and tidy.
As we start fitting the cab back out, all the electrical systems are being checked. In this picture you can see the headcode box lit up and looking very nice and tidy.
More electrical systems being checked over and tested
More electrical systems being checked over and tested
The first new window drip tray was installed and tested to see if it actually works. Once tested the window scissors where refitted
The first new window drip tray was installed and tested to see if it actually works. Once tested the window scissors where refitted
The new steel work in the cab has now been welded into place, with this now down in place the new flooring can be fitted
The new steel work in the cab has now been welded into place, with this now down in place the new flooring can be fitted
Roger is seen marking out areas of the bodywork ready for cutting out
Roger is seen marking out areas of the bodywork ready for cutting out
Members of the group are seen cleaning up the No1 end nose doors, once stripped these will be primed and painted
Members of the group are seen cleaning up the No1 end nose doors, once stripped these will be primed and painted
New sections of steel have started to appear on the No1 drivers side cab
New sections of steel have started to appear on the No1 drivers side cab
The youngest member of the team, Henry is seen applying primer to the bulk head wall
The youngest member of the team, Henry is seen applying primer to the bulk head wall

 
 
 

Related Posts

See All

Comments


C37LG logo.png

The Class 37 Locomotive Group

Erinna Lodge, Mattishall Road

Dereham, Norfolk, NR20 3BU

  • C37LG Facebook
  • C37LG Instagram
  • C37LG X (Twitter)
  • C37LG eBay

© 1997-2025 The Class 37 Locomotive Group (C37LG).

The C37LG is a registered charity, registered in England. | Charity number: 1137787 | VAT registration number: GB 720 172 183

bottom of page