Part of the AWS and fire bell system on the workbench being stripped down and cleaned
Part of the AWS and fire bell system on the workbench being stripped down and cleaned
Sadly when the handrails where removed from the second man's side the bolts sheared off, after a lot of fighting with some heat they still wouldn't bud so in the end they had to be drilled out.
Sadly when the handrails where removed from the second man's side the bolts sheared off, after a lot of fighting with some heat they still wouldn't bud so in the end they had to be drilled out.
As part of the cab refurbishment we've had to make new side panels for the cab interior due to the old ones being beyond repair. Here we see the second man's side panels now fitted back in have stuff like the DSD holdover and Vacuum release valve being refitted
As part of the cab refurbishment we've had to make new side panels for the cab interior due to the old ones being beyond repair. Here we see the second man's side panels now fitted back in have stuff like the DSD holdover and Vacuum release valve being refitted
The nicely overhauled AWS Sunflower gauge now joins the main res gauge fitted back into No2 end,
The nicely overhauled AWS Sunflower gauge now joins the main res gauge fitted back into No2 end,
This is the cab to Nose area door, its been stripped down to bear metal and etched primed ready for a coat of undercoat
This is the cab to Nose area door, its been stripped down to bear metal and etched primed ready for a coat of undercoat
The refurbished lighting panel being trilled refitted back in place
The refurbished lighting panel being trilled refitted back in place
Two very clean cab door window pane, all ready to be fitted back into the doors when they are ready
Two very clean cab door window pane, all ready to be fitted back into the doors when they are ready
The cleaned up roof vent, trial refitted back in place
The cleaned up roof vent, trial refitted back in place
Various small components on the painting bench. These range from door hinges, sand box covers and window washer shields
Various small components on the painting bench. These range from door hinges, sand box covers and window washer shields
The No2 end bulkhead slowly beginning to look the part, just the area above the engine room door to do and its nearly finished
The No2 end bulkhead slowly beginning to look the part, just the area above the engine room door to do and its nearly finished
A very nicely cleaned up handbrake wheel being test fitted.
A very nicely cleaned up handbrake wheel being test fitted.
 A small touch but it looks the part, A replica 3D printed EE badge gets a trial fit
A small touch but it looks the part, A replica 3D printed EE badge gets a trial fit

 
 
 

Related Posts

See All

Comments


C37LG logo.png

The Class 37 Locomotive Group

Erinna Lodge, Mattishall Road

Dereham, Norfolk, NR20 3BU

  • C37LG Facebook
  • C37LG Instagram
  • C37LG X (Twitter)
  • C37LG eBay

© 1997-2025 The Class 37 Locomotive Group (C37LG).

The C37LG is a registered charity, registered in England. | Charity number: 1137787 | VAT registration number: GB 720 172 183

bottom of page